February 7, 2016

205#2 Apartment renovated and ready

this will seem like a big leap in progress from the last pictures, but that's just because this was months ago...

It all start with the freshly painted hallway and front door. (I plan on upgrading the flooring in the whole common area at once and left what was there already)

Which leads into the kitchen with the raised ceilings, new ceiling fan, and full height windows. There's a built in overhang to put s trash can, and full pantry closet (not pictured). I reused these hardwood cabinets, the corian countertops, the stainless steel sink, and the appliances from various places, but it turned out to be a really solid kitchen.


Plenty of space for a kitchen table

Here's the newly renovated bathroom with herring bone patterned floor

New vanity, toilet, and fixtures

Subway tile shower surround and frosted window

Bathroom storage shelves and new door.

New flooring continues throughout the entire apartment

Firs larger bedroom with a closet

Second bedroom with a closet

Back living room with another closet and views of the city and OTR rooftops outside (and my hops)

I also have a creative chalkboard cover for the electrical panel in the hallways that I'll add later.

No comments:

Post a Comment