May 16, 2013

203-3 pictures during construction - drywall, kilz, and ceiling white

The following are a few of the camera phone pictures that I've taken while my dad and I have resurfaced the drywall in 203 apartment 3. At this point we have resurfaced the drywall on the walls and ceilings in 3 of the biggest rooms with the hallways, kitchen and bathroom still to go still. We've also used kilz primer to lock any stains/smells behind everything and then painted the ceilings "ceiling white."

This weekend I'll be tearing up the indoor/outdoor carpeting and trying to level the apartment from back to front in order to prepare it for a yet to be determined floating hardwood laminate of some type (we'll see what's on sale).











No comments:

Post a Comment